Construction & Development
Construction money fails on draws and timing, not ideas.
Construction & Development Financing
Construction money fails on draws and timing, not ideas.
I’ve been on the building side of this. I structure construction financing around how a project actually spends money — not how a spreadsheet wishes it did.
What I work on
- Construction mortgages — single-family and small multi-unit builds, from land to completion
- Draw management — budgets built so draws arrive when the work needs paying for
- The gap after completion — planning the stretch between finishing the build and arranging long-term financing
- Inventory financing — financing for completed or near-completed units that haven’t sold yet, so capital isn’t trapped in finished product
Where projects get stuck
Usually it’s not the project — it’s the structure:
- A budget that doesn’t match the draw schedule
- No reserve for the gap between built and sold
- A lender slower than the build
I review total cost, your equity, the draw rhythm, and the exit — before we approach anyone.
15 units built. 10 financed. Two old loans gone.
A builder completed 15 units and needed financing on 10. One structure paid out the construction mortgage and a high-interest second mortgage — with every lender coordinated so the pieces closed together.
Having worked hands-on in development, I speak both languages — the builder’s and the lender’s. That saves translation, and stalled draws.
Related
Finished units often sit inside a wider portfolio — see Multi-Property & Investors for restructures, and Private & Alternative Lending for bridge and inventory options.
Planning a build, mid-project, or sitting on finished inventory? Call or text 604-835-4999 and walk me through where it’s at.
Gavin Toor Personal Mortgage Corporation
CPA | Licensed Mortgage Broker
BCFSA Licence #MB603955
Dominion Lending Centres Volterra Capital — Independently Owned & Operated
202 – 15055 54A Avenue, Surrey, BC V3S 5X7
Call or text: 604-835-4999